Class 1C or 3 declaration
To operate a Class 1C or 3 facility, a prior declaration is needed. The process is free and takes about 30 days. Appeals can be made alongside the College of the Environment.
- bhg.procedurepage.audience: Citizen and Companies
- bhg.procedurepage.cost: Free
- bhg.procedurepage.duration: 30 days
- bhg.procedurepage.response: 30 days
- bhg.procedurepage.mode: Digital
- bhg.procedurepage.validity: French and Dutch
In order to be able to operate a Class 1C or 3 facility, a declaration must be made in advance.
Appeal
Alongside the College of the Environment
Les formulaires relatifs aux permis d'environnement